Skip to Main Content
  • 简体中文 
  • English 
  • 林德全球
  • 林德集团网站
  • 关于林德
  • 工程
    中国

  • Home
  • 关于林德工程
      • 管理层
        • 杨博成博士
        • 查文杰
        • 于恒
        • Tilman Weide
      • 位置
        • Linde Engineering Dresden
        • 林德工程沙尔逊工厂
        • Selas-Linde GmbH
        • Linde Kryotechnik AG
        • Cryo AB
        • Cryostar SAS
        • Linde CryoPlants Ltd.
        • Linde Engineering Rus, OOO
        • Linde Engineering North America Inc. - Tulsa, Oklahoma
        • Selas Linde North America
        • Linde Engineering North America Inc. - Houston Office
        • Hydro-Chem
        • Linde Engineering India Pvt. Ltd.
        • 林德工程(杭州)有限公司
        • 林德工程(大连)有限公司
        • Linde Arabian Contracting Co. Ltd.
        • Linde Engineering Middle East LLC
        • Linde Engineering Korea Ltd.
        • Linde Engineering South Africa (Pty) Ltd.
      • 质量,健康,安全与环境
        • 企业责任
        • 企业资质
        • 施工现场质,健康,安全和环境
      • 工程业绩
      • Quality, Health, Safety & Environment (QHSE)
        • QHSE at construction sites
        • Certificates and awards
      • 企业历史
        • 林德工程在中国
        • Collaborate.
        • Innovate.
        • Deliver.
  • Process Plants
      • 空气分离装置
        • 定制化空分装置
        • 模块化空分装置
        • 业绩
      • 液化天然气和天然气处理装置
        • 液化天然气 (LNG)
        • 天然气液 (NGL)
        • 脱氮
        • 氮回收和液化
        • 业绩
      • 氢气和合成器装置
        • 气体产品
        • 气体制备
        • 气体处理装置
      • 石化装置
        • 蒸汽裂解炉
        • 乙炔回收
        • 线性α-烯烃
        • 聚烯烃装置
        • 专利技术
        • Gemini - 甲烷氧化偶联(OCM)
        • 业绩
      • 吸附装置
        • Membrane plants
        • Carbon dioxide removal and purification
      • 低温装置
        • Helium recovery systems
      • 二氧化碳装置
        • CO₂ purification and liquefaction
        • Carbon capture
        • References
      • 高炉、加热器和焚烧炉
        • 蒸汽重整炉
        • Cracking furnaces for ethylene production
        • 低温汽化器
        • Fired heaters and waste heat recovery units
        • 特种炉
        • Incinerators and thermal oxidisers
  • 装置组成
      • 板翅式换热器
        • 板翅式换热器多功能设计
      • 成套装置/冷箱
      • 工艺塔 / 压力容器
      • 绕管式换热器
      • 深冷罐
        • Customer Information Centre
      • 空温式气化器
      • 水浴式气化器
      • 螺旋焊接铝管
      • UN portable tank (HELICS™)
      • 附加服务
  • 服务
      • Engineering
        • Modularisation
      • 采购服务
        • 供应商窗口
      • 施工
      • Export and project financing
  • Innovations
      • Virtual reality redefines plant engineering
      • Innovative dry reforming process
      • FlexASU®
  • Careers
      • Work @ Linde
      • People @ Linde
        • License to Fill
        • Matthias & the Mechanics
        • The Pathfinder
        • Giving Back
      • Roles @ Linde
        • Engineers & Technicians
        • Sales & Customer Service
        • Healthcare & Homecare
        • Corporate Functional Staff & Admins
        • Operational Staff, Fillers & Drivers
      • Jobs @ Linde
        • Locations worldwide
      • 000 Students & Graduates @ Linde
        • School Students
        • University Students
        • University Graduates
      • Apply @ Linde
      • Job Blog
        • A Dream Job
        • A New Home
        • Insider Tips
        • Shell Eco-marathon
        • Shell Eco-marathon London
        • Shell Eco-marathon: Driving change
        • A whole new weld
        • Mission: Impossible
        • Into the future: at the push of a button
        • Get with the programme
        • Shell Eco-marathon: Learning from the young
        • Many cultures, one company: Linde Global Services
        • Spark of genius
        • Commissioning engineers
  • 联系我们
  •  
  • Language
    • 简体中文
    • English
  • 林德全球
  • 林德集团网站
  • 关于林德
  • 关于林德工程
  • 管理层
  • 位置
  • 质量,健康,安全与环境
  • 工程业绩
  • Quality, Health, Safety & Environment (QHSE)
    • QHSE at construction sites
    • Certificates and awards
  • 企业历史
  • 关于林德工程
  • Quality, Health, Safety & Environment (QHSE)
  • QHSE at construction sites
The world’s largest gas-to-liquids facility went on
stream in 2011 in the State of Qatar. At full capacity,
it produces 140,000 barrels of liquid hydrocarbons
and 120,000 barrels of condensate, liquid petroleum
gas and ethane per day. Eight large air separation
plants built by Linde supply the facility with the oxygen
it needs – around 860,000 cubic metres per hour.

QHSE at construction sites We hardwire quality, health, safety and environment (QHSE) issues into every construction project right from day one, ensuring our outstanding track record on construction sites the world over.

Quality, health, safety and the environment (QHSE) are a key part of the construction, commissioning and start-up phases of any project. They must be managed carefully in close collaboration with clients, contractors, suppliers and other partners.

At Linde Engineering, we take QHSE at our construction sites very seriously and strive to meet the following objectives:

  • Zero incidents

  • Safe, secure and healthy working conditions for everyone who works with and for us

  • Safe, high-quality and environmentally responsible products and services

  • Responsible use of natural resources

On-site QHSE has to be hardwired into a project right from day one and continuously monitored throughout the entire project. Our Integrated Management System provides a comprehensive set of tools for steering our QHSE activities here.

To ensure that the right organisation, planning, procedures and systems are in place at all of our construction sites we focus on a wide range of QHSE issues at the planning stage of every project. These include:

  • Identifying relevant legal requirements and other QHSE aspects

  • Identifying project-specific risks

  • Preparing project-specific QHSE concepts, programs and procedures (based on Linde’s standard and project-specific requirements)

  • Coordinating project-specific programmes and procedures with contractors

  • Planning site management organisation (including QHSE)

  • Conducting constructability reviews to optimise the construction process

Once construction starts, we establish clear lines of leadership and accountability – from site and construction managers through to individual supervisors. We also appoint dedicated QHSE experts to monitor our performance at all times and use KPIs, routine reviews and audits to further benchmark our QHSE performance at all of our construction sites.

联系我们
  • 林德工程(杭州)有限公司

    中国浙江省杭州市西湖区莲花街333号莲花商务中心北楼

    邮编: 310012

    电话:+86-571-8501 9222

    传真:+86-571-8501 9200

    客服热线:4008-555-857


    林德工程(大连)有限公司

    中国辽宁省大连市甘井子区定远路70号

    邮编: 116113

    电话:+86-411-3953 8888

    传真:+86-411-3953 8866

    发送邮件
    • 使用条款
    • 法律通知
    • 数据保护
  • © 2019林德集团

To enhance your user experience and to deliver our online services, this website uses cookies for reasons of functionality, comfort and statistics. By continuing to browse the site, you are agreeing to our use of cookies.
You can find out more on our data protection information.
You must check the "I accept cookies from Linde Sites" box to accept.
More